Eastbrook Studios
WP3 were appointed as MEP, AV, IT and Security design consultants, monitoring engineers and client’s Commissioning Managers (CxA) for Eastbrook Studios, London’s largest and most sustainable film and television production hub.
WP3 were appointed as MEP, AV, IT and Security design consultants, monitoring engineers and client’s Commissioning Managers (CxA) for Eastbrook Studios, London’s largest and most sustainable film and television production hub.
Capital Group’s new European HQ at 1 Paddington Square is a modern, award-winning, nine-floor office space designed for collaboration and sustainability, achieving both BREEAM Excellent and LEED Gold.
Global Switch London North consisted of the retrofit of the former Financial Times printing works which first opened for data centre use in the height of the “dot-com” boom in late 1999.
CFC Underwriting relocated their two Leadenhall Market–adjacent offices into Levels 10–18 of the new sustainable 8 Bishopsgate tower, with WP3 guiding them through a major shift in working style and technology integration. Working closely with the landlord’s technical team, WP3 rigorously tested and challenged plant and spatial constraints to optimise comfort and performance across the large multi-floor workplace. By securing early approvals and engaging incumbent contractors throughout, the team de-risked licensing, pre-construction and build stages. … Read more
Following a move from their 99 Bishopsgate base, this Global Law Firm are relocating to the recently completed 1 Leadenhall premises. The Firm will occupy a substantial space (almost half) within the state of the art development, with the move due to be completed in the summer of 2026.
WP3 has been appointed to design a showcase showroom within the head office of a global luxury brand in London, SW1. We have developed the MEP concept design to RIBA Stage 2 and continue to support the project closely as it moves through procurement and into construction.